GENERATION & TRANSMISSION

Three projects.
One connected system.

Installed capacity and expansion provision,
clearly distinguished.

NATIONAL CAPITAL

70 MW

Two phases. One power station.

Initial 35 MW, followed by a 35 MW expansion. Both phases delivered.

COMMERCIAL CAPITAL

52.5 MW

Built with room to grow.

Three 17.5 MW engines installed. Infrastructure designed for 105 MW, with space for three more engines.

Solid: installed capacity. Outline: provision for future expansion.

HIGH-VOLTAGE TRANSMISSION

30+ km

Connecting generation to demand.

Electrical substation from the Falcon Eye energy project archive

A separate transmission project supporting distribution to cities and other locations.

Location
Africa
Discipline
ENERGY
Falcon Eye’s role
Project origination, financing and overall project management
Perspective
International expertise.
Local implementation.
Detail from the Falcon Eye project archive
From the Falcon Eye project archive.

01 / THE CHALLENGE

The challenge

Reliable electricity depends on more than generating capacity. Power stations, transmission infrastructure, financing and operational expertise must work together as one system.

Bringing the solution together

Falcon Eye International initiated and managed two gas-fired power station projects serving the national capital and the commercial capital of the same African nation. We led contract negotiation and arranged international project financing. Contractor partners carried out construction under our supervision and overall project management.

Detail from the Falcon Eye project archive
From the Falcon Eye project archive.

02 / IMPLEMENTATION

Making it work on the ground

The station serving the national capital was delivered in two phases of 35 MW, reaching 70 MW. In the commercial capital, three 17.5 MW engines provided 52.5 MW of installed capacity. Infrastructure there was designed for 105 MW, with room for three additional engines. Falcon Eye also managed a separate project delivering more than 30 km of high-voltage transmission lines.

Beyond the immediate task

The stations supplied stable, reliable electricity to both cities, alongside other sources of power. Our involvement continued into operation and maintenance management for both plants and the transmission infrastructure. Specialist subcontractors and local partners performed the operational work under Falcon Eye’s management.